




RUO WU
Home Office Chair Ergonomic Desk Chairs Mesh Computer With Rolling Swivel Adjustable Grey
$154.99$192.99
Save $38.00Available at
phantomtagprotector.comBest Price
$192.99$154.99
ViewThis trendy grey office chair combines comfort and support with its ergonomic design. Featuring a breathable mesh backrest with a lumbar support pattern and a cushioned sponge seat, it ensures comfort during long workdays. The chair is equipped with adjustable armrests, a 360-degree swivel function, and a tilt/lock mechanism. It sits on a sturdy white five-star base with nylon rollers, allowing for easy mobility. The adjustable-height pneumatic cylinder and rolling swivel design make it perfect for both home and commercial office environments.
- Ergonomic design with adjustable lumbar support
- Breathable mesh backrest with perforations
- Cushioned grey sponge seat
- Adjustable armrests and seat height
- 360-degree swivel and rolling caster wheels
- Tilt/lock mechanism
- Maximum weight recommendation: 275 pounds
- Made with metal, mesh, sponge, and nylon materials
Details
- Category
- Office Chairs
- Materials
- Mesh, Sponge, Metal, Nylon
- Age
- Adult
Questions & answers
- How much does it cost, and where can I buy it?
- This RUO WU office chair is sold by 1 retailer for $154.99. It's currently on sale (up to 20% off). Available at phantomtagprotector.com.
- Is it in stock?
- Yes, it's currently in stock.
- What are the key features?
- Key features include Ergonomic design with adjustable lumbar support, Breathable mesh backrest with perforations, Cushioned grey sponge seat, Adjustable armrests and seat height, and 360-degree swivel and rolling caster wheels.
- What is it made of?
- It's made of mesh, sponge, metal, and nylon.